Please see the attached weekly update regarding the LPSS,
Additionally, we have some more information about the electrical requirements that are needed for the pump system, as well as a list of electricians from the surrounding area who are familiar with the LPSS Project.
Electrical Work:
After installation of the pump into your holding tank, the wires will be left coiled inside the top of your tank. The electrician you hire will be responsible to bring those wires through the tank to a junction box and connect to power. All the specifications for the pumps electrical requirements are in the manual attached and this can be provided to the electrician. A control panel will be supplied to each resident when the pump is installed. If you plan to complete the electrical work before the pump installation, please contact operations to set-up a time to pick up the control panel. Control panels will not be available for pick up until after September 30th, 2025.
Electricians in the Area:
Many residents have asked for information for electricians in the area who are familiar with the project. Please feel free to contact any of the companies below, or your own electrician to complete the work required for your system.
- Mitchell Electric – 306-260-4481
- BTE (Burwell Trenching and Electrical) – 306-220-4377
- Gray Point Contracting Inc. – 306-434-0400