Control Panel Pick-up and Electrical Information

I have heard from some residents that they missed the email with the Electrical information that was sent on August 22nd. I have included that information for you again below.

CONTROL PANEL PICK-UP INFORMATION–

We have received the control panels, and they will be available for pick-up to residents after Wednesday next week. We will have two dates scheduled for residents to pick up their control panels:

September 18             12:00pm - 3:30pm                    Shields Community Hall

September 22             5:00pm - 8:00pm                      Shields Community Hall

If you cannot come and retrieve your control panel during the two allotted pick-up times, please email me to schedule a different time to pick up your panel.

ELECTRICAL INFORMATION–

After installation of the pump into your holding tank, the wires will be left coiled inside the top of your tank. The electrician you hire will be responsible to bring those wires through the tank to a junction box and connect to power. All the specifications for the pumps electrical requirements are in the manual attached and this can be provided to the electrician. A control panel will be supplied to each resident when the pump is installed. If you plan to complete the electrical work before the pump installation, please contact administration to set-up a time to pick up the control panel. Control panels will not be available for pick up until after September 17th, 2025. (See above for information about pick-up)

Electricians in the Area:

Many residents have asked for information for electricians in the area who are familiar with the project. Please feel free to contact any of the companies below, or your own electrician to complete the work required for your system.

  1. Mitchell Electric – 306-260-4481
  2. BTE (Burwell Trenching and Electrical) – 306-220-4377
  3. Gray Point Contracting Inc. – 306-434-0400

Crane-ZOGV_NEX-Controller_vendor_submittal

Jessica ArguinChief Administrative Officer