Site Overlay

Announcements from Operations Department

  1. Road Grading is scheduled for Friday (May 10th) – weather permitting.  Please be sure that vehicles, RVS etc. are away from the road allowance in advance. If you are parked close to the road allowance, please be sure to park parallel to the roadway. This allows the grader to move more fluently.
  2. We will attempt to turn the irrigation system on, on Thursday (May 9).  Please be sure that your outdoor taps are turned off in advance. If no concerns arise during the trial run the system will remain on.
  3. All seasonal water metres will be installed starting tomorrow May 8th.